Indoor Activity Center (IAC) at AHS


The Bond 2022 package includes an Indoor Activity Center (IAC) at the Argyle High School campus in Canyon Falls. The IAC will be located on the east side of the existing field house behind AHS. The IAC will include a 60-yard artificial turf field and will be utilized by athletic teams and the AHS band. The IAC was a separate proposition (Prop C) in the voter-approved bond package.

Scope of Work

  • Architect: VLK
  • Construction: Pogue
  • 60-yard field
  • Artificial Turf
  • Visiting football/soccer team locker room
  • Located on east side of field house
  • Used by athletic teams & band

Tentative Project Schedule
Design: January 2023 - December 2023
Procurement: December 2023 - February 2024
Projected Construction: 2024 2025
Projected Opening: Fall 2025